The Escravos- Lagos Pipeline System (ELPS) is designed to gathers gas from Escravos through 20″ & 24″ ELPS A line, Utorogu through 30″ ELPS B line and other gas plants within the Niger Delta (Odidi and Oben Gas plants), and delivers it through 36″ ELPS line to Itoki. An additional 36″ loop line was also constructed to increase gas volume delivery capacity.
Two compressor stations CS1 with georeferenced KP52.7 & CS2 with georeferenced KP135 are now proposed to boost gas capacity from 1,100 MMSCFD of the existing ELP system to ELP system 2,200 MMSCFD.
ClientSPDCServicesP&CYear2023