The project is a complete EPC project. Summary list of activities carried out under this contract for improved performance:
• Process Engineering, detail Engineering. calculation and sizing of Process Equipment; SMS Scrubbers, Glycol/Condensate Heat enchanters, new inlet gas/sales gas heat exchangers,
• Sizing of Control Valves
• Pressure Vessels and Heat Exchanger Calculations
• Process & Utility Calculations • Equipment Sizing Reports for Heat enchanters, waterbath heaters, scrubbers,
• Flare/Blowdown studies & specifications for Utorogu 360mmscf/d capacity
• Process Control & optimization study to
minimize glycol consumption
• Piping Assembly/isometric drawings Piping Stress Calculations
• Facilitate HAZOP of the new installations
• Update Plant’s load list
• Prepare specifications for electrical cables.
• Fabrication, Construction and installation of interconnecting pipes
• Civil construction
• Installation of vessels, Heat Exchanger and water bath heaters

ClientSPDCServicesEPC

Can we help?

info@lee-engineering.net
+234 (0) 1 904 9850
+234 (0) 708 416 6957

Connect with Us

HQ: 39, Norman Williams Street,
Ikoyi, Lagos, Nigeria

Operations Base: KM 7, NPA Express Ekpan
P.O Box 3101, Warri, Delta, Nigeria

Project Base: 40B Gen Diryai Street GRA Phase1, Port Harcourt, Rivers, Nigeria

LIASON OFFICES
Houston, USA: 10375 Richmond Avenue. Suite 1600, Houston TX 77042, USA

Italy: Lee International Services S.r.l – Via Lazzaretto 19 20124 Milano


Celebrating Over 30 Years Of Meritorious Service Delivery! 💚

Privacy Preference Center