West Africa Gas Pipeline Project (WAGP)

The project comprise the implementation of series of activities to achieve stringent WAGP gas specification, metering and monitoring requirement, carryout integrity related works to renew plant design life for another 20yrs & debottleneck Utorogu gas plant from 270mmscf/d to 360 mmscf/d, The work is in 2 phases. Phase 1 work covers integrity and dew point related modification works at Utorogu and Oben gas plant to meet the gas supply agreement. While phase 2 works include installation of online metering and quality monitoring systems and VSAT data transmission facilities at 5 SPDC inlet points namely Oben NAG, Utorogu NAG, Jones creek NGC, Odidi NGC and Escravos Beach NGC. Transportation of offshore materials & equipment, project management, detailed engineering design and review, materials procurement, mobilization, project technical and logistics services, plants rehabilitation and modification works, modification of vessel internals, installation works, upgrade of process control systems and electrical switchgears, construction of new inlet flowlines and ligaments, modules rehabilitation, fabrication and installation of new metering house and gas metering and online monitoring equipment, fire & gas detection and alarm system, civil works, painting and demobilization.

ClientSPDCServicesEPCYear2011

Can we help?

info@lee-engineering.net
+234 (0) 1 904 9850
+234 (0) 708 416 6957

Connect with Us

HQ: 39, Norman Williams Street,
Ikoyi, Lagos, Nigeria

Operations Base: KM 7, NPA Express Ekpan
P.O Box 3101, Warri, Delta, Nigeria

Project Base: 40B Gen Diryai Street GRA Phase1, Port Harcourt, Rivers, Nigeria

LIASON OFFICES
Houston, USA: 10375 Richmond Avenue. Suite 1600, Houston TX 77042, USA

Italy: Lee International Services S.r.l – Via Lazzaretto 19 20124 Milano


Celebrating Over 30 Years Of Meritorious Service Delivery! 💚

Privacy Preference Center